Related Documents
November 27, 2015 – Gold Bullion Development Corp. (TSXV: GBB) (OTCPINK: GBBFF) (the “Company” or “Gold Bullion”) is pleased to provide an update on work at the Granada Mine site where 10,000 tonnes of mineralized material from the existing waste pile has been sorted to be used for commissioning the mill prior to commencing the processing of the “rolling start” mined rock. This work has been ongoing since July 2015, resulting in the first batch of rock now stockpiled and awaiting sampling. This mineralized material is not part of the existing mineral reserves.