Press Releases

Related Documents

September 11, 2019 Granada Gold Mine Inc. (TSX.V: GGM) (“Granada Gold” or the “Company”) announces a non-brokered private placement offering of 2,200,000 units (“Units”) at a price of $0.10 per Unit for gross proceeds of up to $220,000. Each Unit is comprised of one common share of the Company and one share purchase warrant. Each whole warrant will entitle the holder thereof to purchase one additional common share of the Company at an exercise price of $0.15 per share, for a period of two years from closing, subject to TSX Venture Exchange (“Exchange”) approval.

The proceeds of the Private Placement will be used for surface exploration, trenching, and historical resampling of drill core on the Company’s Granada Gold Property in Québec and for general working capital purposes.

All securities issued in connection with the private placement are subject to a four month and a day hold period in accordance with applicable Securities Laws.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. continues to develop the Granada Gold Property near Rouyn-Noranda, Quebec. Approximately 120,000 meters of drilling has been completed to date on the property, focused mainly on the extended LONG Bars zone which trends 2 kilometers east-west over a potential 5.5 kilometers of mineralized structure. The highly prolific Cadillac Break, the source of more than 75 million plus ounces of gold production in the past century, cuts through the north part of the Granada property.

Pit-Constrained Mineral Resources at Granada disclosed on February 13th, 2019 Press Release prepared by SGS independent QP stand at:

CategoryTonnesGrade (g/t Au)Contained Au (oz)
Measured12,637,0001.02413,000
Indicated9,630,0001.13349,000
Measured & Indicated22,267,0001.06762,000
Inferred6,930,0002.04455,000

Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

+ Open pit mineral resources are reported at a cut-off grade of 0.4 g/t Au within a conceptual pit shell. Cut-off grades are based on a gold price of US$1,300 per ounce, a foreign exchange rate of US$0.76, and a gold recovery of 95%.

The Company is in possession of a mining permit required to commence the initial mining phase, known as the “Rolling Start”, which allows the company to mine up to 550 tonnes per day. Additional information is available at www.granadagoldmine.com.

“Frank J. Basa”

Frank J. Basa P. Eng.
President and Chief Executive Officer

For further information, please contact:
Frank J. Basa, P. Eng., President and CEO at 1-819-797-4144 or
Wayne Cheveldayoff, Corporate Communications, at 416-710-2410 or waynecheveldayoff@gmail.com

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements

© 2024 Granada Gold Mine Inc.
All rights reserved.
Disclaimer

Subscribe to our Email List